Working method of ecological building with higher tree surviving rate

Working method of ecological building with higher tree surviving rate

  • CN 104,674,939 A
  • Filed: 07/11/2012
  • Published: 06/03/2015
  • Est. Priority Date: 07/11/2012
  • Status: Active Application
First Claim
Patent Images

1. a method of work for ecotecture, is characterized in that this ecotecture comprises:

  • the ecotecture cavity being located at building side, and this cavity comprises;

    the plantation chamber (4) be separated up and down by seepage material and accumulation of energy chamber (6);

    Be equipped with for the seepage material (8) to the soil infiltration in described plantation chamber (4) in accumulation of energy chamber (6);

    Described accumulation of energy chamber (6) is connected with a rain collector;

    Be provided with one in described accumulation of energy chamber (6) for the location gutter of downward draining, the entrance of this location gutter (19) is lower than described seepage material (8);

    This building is multistory building building, and described cavity has multiple, and distributes up and down, and described location gutter (19) of top cavity is connected with the basement ditch (21) in the cavity of adjacent below;

    Described basement ditch (21) is connected with a full-automatic water-supplying, discharge cycle system;

    Described cavity is made up of the balcony structure layer and parapet with body of wall one;

    Described balcony structure layer is lower than the height of the floor of same layer;

    Be provided with safety barrier (2) in the middle of the parapet, in safety barrier (2) and described plantation chamber (4) trees tree mobile jib between coupling bar (1) is installed, with fixing trees;

    Described method of work, is characterized in that comprising;

    Step 1;

    the water in described rain collector is entered described accumulation of energy chamber (6);

    Step 2;

    the water in accumulation of energy chamber successively through described seepage material, block native net and ooze to the soil in described plantation chamber, carry moisture content;

    Step 3;

    the water higher than described position-limiting tube entrance is discharged by the location gutter (19) in described accumulation of energy chamber (6).