Base used for power transmission and transformation project tower and capable of being continuously adjusted as whole
Base used for power transmission and transformation project tower and capable of being continuously adjusted as whole
- CN 105,544,590 A
- Filed: 10/15/2010
- Published: 05/04/2016
- Est. Priority Date: 10/15/2010
- Status: Active Application