Gas-fired boiler and distributed off-peak electricity boiler joint heat supply system and method

Gas-fired boiler and distributed off-peak electricity boiler joint heat supply system and method

  • CN 105,605,651 A
  • Filed: 12/25/2015
  • Published: 05/25/2016
  • Est. Priority Date: 12/25/2015
  • Status: Active Application
First Claim
Patent Images

1. gas fired-boiler and a distributed paddy electric boiler combining heating system, is characterized in that, comprising:

  • The first circulating pump, several gas fired-boilers gas fired-boiler connected in series or in parallel are controlled for thermal sub-system, firstDevice processed, several distributed paddy electric boilers distributed paddy electric boiler connected in series or in parallel for thermal sub-system andSecond controller;

    Wherein, described distributed paddy electric boiler refers to the electric boiler as the energy with trough-electricity, described distributed paddyElectric boiler disperses to be placed on each equipment room for thermal region or each heat supply building;

    Described the first circulating pump is connected for the input of thermal sub-system with described gas fired-boiler;

    The output of described gas fired-boiler confession thermal sub-system and described distributed paddy electric boiler supply thermal sub-systemInput is connected;

    Described the first controller, for controlling described gas fired-boiler, non-trough-electricity period or whole day are carried out by dayHeat supply;

    Described second controller, replaces institute for controlling described distributed paddy electric boiler in the night dip electricity periodStating gas fired-boiler carries out heat supply or assists described gas fired-boiler to carry out heat supply.

View all claims
    ×
    ×