Fuel cell multi-parameter optimization test system and operation method thereof

Fuel cell multi-parameter optimization test system and operation method thereof

  • CN 106,450,384 A
  • Filed: 11/29/2016
  • Published: 02/22/2017
  • Est. Priority Date: 11/29/2016
  • Status: Active Application
First Claim
Patent Images

1. a kind of fuel cell multi-parameters optimization test system, it is characterised in that:

  • Mainly include gas cylinder (1), air relief valve (2), filter (4), gas supply electromagnetic valve (5), dry gas control valve (7), humidification controlValve (8), humidifier (9), PEM fuel cell pile (12);

    Gas cylinder (1) is through air relief valve (2) connection filter (4), then and through gas supply electromagnetic valve (5) and is humidified by dry gas control valve (7)Control valve (8) is divided into two-way:

    Wherein, a road is passed directly into fuel cell pack (12), another road humidified control valve (8), humidification through dry gas control valve (7)Device (9) incoming fuel battery pile (12).

View all claims
    ×
    ×

    Thank you for your feedback

    ×
    ×