Method and system for generating quality management test program

Method and system for generating quality management test program

  • CN 1,366,235 A
  • Filed: 01/17/2001
  • Published: 08/28/2002
  • Est. Priority Date: 01/17/2001
  • Status: Abandoned Application
First Claim
Patent Images

1. a method that produces production test plan is used for the quality control program, and described production test plan has a pyramid structure, and this pyramid structure includes:

  • One first top layer is used for confirming described production test plan;

    One first intermediary layer includes the test report archives of at least one described production test plan;

    AndOne first bottom includes at least one test event archives at described test report archives, and each described test event archives all includes at least one testing procedure, and this testing procedure is used for carrying out the test of a project;

    Wherein, described first top layer is used for the access described test report archives relevant with described first top layer, and described test report archives are used for the access test event archives relevant with described test report archives;

    Described method includes;

    One panel clamp is provided, and this panel clamp includes at least one model, and each model all has a pyramid structure, and this pyramid structure includes;

    One second top layer is used for confirming described model;

    One second intermediary layer is used for confirming the minimum subroutine of described model;

    AndOne second bottom includes at least one pressure project archives at described subroutine, and each described pressure project archives all includes at least one testing procedure, and this testing procedure is used for carrying out the test of a project;

    Wherein, described second top layer is used for the subroutine of the access described model relevant with described second top layer, and described subroutine is used for the access pressure project archives relevant with described program;

    One selective system is provided, and this selective system allows the user can choose a model from described panel clamp, chooses a subroutine again from described model, chooses a model project file at last again from described subroutine;

    AndOne converting system is provided, and this converting system is used for the described model that will choose, the described subroutine of having chosen and the described pressure project archives chosen convert a relative production test plan to;

    Wherein, the hierarchy type option table that the user produces by described selective system is selected at least one subroutine of a model, this model and at least one pressure project archives of the subroutine chosen, described converting system then produces a production test plan according to described hierarchy type option table, this production test plan has one at one of each pressure project archives of having selected relevant test event archives, and the described pyramid structure of described production test plan is consistent with the pyramid structure of described hierarchy type option table.

View all claims
    ×
    ×