Construction method for prestressed piles and walls with deep foundation ditches being supported
Construction method for prestressed piles and walls with deep foundation ditches being supported
- CN 1,431,369 A
- Filed: 02/17/2003
- Published: 07/23/2003
- Est. Priority Date: 02/17/2003
- Status: Abandoned Application