Gravity dam of reinforced concrete

Gravity dam of reinforced concrete

CN
  • CN 1,487,146 A
  • Filed: 07/11/2003
  • Published: 04/07/2004
  • Est. Priority Date: 07/11/2003
  • Status: Active Application
First Claim
Patent Images

1. , when the dam body upstream face is vertical, with vertical lap seam the dam is stopped after part is divided into some thin plates and downstream part (if having) during construction, on the diverse location of each thin plate, use the hawser that is anchored in the dam foundation, apply the prestressing load of vertical direction to thin plate, or use horizontal reinforcement (hawser) to apply the prestressing load of horizontal direction to thin plate more simultaneously, at last, again each thin plate and downstream part are bonded to integral body, with a vertical prestress distribution on the acquisition dam section, or obtain a horizontal prestressing distribution simultaneously.

View all claims
    ×
    ×

    Thank you for your feedback

    ×
    ×