High building hot water heating system returning water static pressure delivering cut off
High building hot water heating system returning water static pressure delivering cut off
- CN 2,509,485 Y
- Filed: 09/10/2001
- Issued: 09/04/2002
- Est. Priority Date: 09/10/2001
- Status: Active Grant