1. A method of controlling data center operations comprising:

  • receiving a first expression from at least one of a database, an application, an application programming interface, or a controller;

    parsing, by a data center infrastructure control system (“

    DCICS”

    ), the first expression to identify a first operation and data collection points associated with data center assets;

    generating, by the DCICS, first machine code instructions based on the first expression, wherein the first machine code instructions include instructions to obtain at least a first point data from the data collection points and perform the first operation based upon the first point data;

    obtaining the first point data from the data collection points according to the first machine code instructions, the data collection points including at least one sensor associated with the data center assets;

    executing, by the DCICS, the first machine code instructions to produce a first result of the first operation based on at least the first point data;

    determining, by the DCICS and based upon the first result, a first control instruction;

    executing the first control instruction for changing an operational state of at least one of a data center asset and a data center as a control operation result and further for generating a second expression;

    parsing, by the DCICS, the second expression to identify a second operation and the data collection points associated with the data center assets;

    generating, by the DCICS, second machine code instructions based on the second expression, wherein the second machine code instructions include instructions to obtain at least a second point data from the data collection points and perform the second operation based upon the second point data;

    obtaining the second point data from the data collection points according to the second machine code instructions, the data collection points including the at least one sensor associated with the data center assets;

    executing, by the DCICS, the second machine code instructions to produce a second result of the second operation based on at least the second point data;

    comparing the first result to the second result; and

    determining a verification of the change in the operational state resulting from the execution of the first control instruction based on the comparison between the first result and the second result.