×

A Yard Performance Model Based on Task Flow Modeling

  • US 20020082814A1
  • Filed: 12/28/2000
  • Published: 06/27/2002
  • Est. Priority Date: 12/29/1999
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing railcar movement in a railyard based on the flow of railyard tasks, using a system including a computer that includes a processor, a memory device, and a database, the railyard including six subyards, said method comprising the steps of:

  • inputting initial parameters to the computer;

    simulating railyard task flow utilizing a yard performance model and the initial parameters; and

    determining if a train schedule can be met based on the simulated yard task flow.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×