×

Yard performance model based on task flow modeling

  • US 6,961,682 B2
  • Filed: 12/28/2000
  • Issued: 11/01/2005
  • Est. Priority Date: 12/29/1999
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for managing railcar movement in a railyard based on the flow of railyard tasks, using a system including a computer that includes a processor, a memory device, and a database, the railyard including six subyards, said method comprising the steps of:

  • inputting initial parameters to the computer;

    simulating railyard task flow utilizing a yard performance model and the initial parameters; and

    determining if a train schedule can be met based on the simulated yard task flow.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×