×

Cascading metrology apparatus and methodology

  • US 7,904,262 B2
  • Filed: 06/23/2006
  • Issued: 03/08/2011
  • Est. Priority Date: 09/29/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method for monitoring energy, comprising:

  • providing a plurality of single phase energy monitoring devices, each of such single phase energy monitoring devices comprising a first data combiner, a single phase metrology board for generating single phase energy related data, and a second data combiner;

    connecting the plurality of single phase energy monitoring devices in a seriatim configuration;

    combining a signal from a first data combiner in a first of the plurality of single phase energy monitoring devices in the seriatim configuration with energy related data from the single phase metrology board of a second of the plurality of single phase energy monitoring devices in the seriatim configuration; and

    determining total multiphase monitored energy by monitoring an output from the second data combiner in a second of the plurality of single phase energy monitoring devices in the seriatim configuration.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×